Compliant bids in the construction industry
A tender (or bid) is a submission made by a prospective supplier (such as a contractor) in response to an invitation to tender (ITT) from a client. It makes an offer for the supply of goods or services.
If a prospective contractor or supplier submits a tender which meets the client's stipulated requirements, (ie the mandatory elements of the Invitation to Tender (ITT) have been satisfied) then that bidder is said to have submitted a compliant bid.
Guidance to prospective bidders is usually clear about the requirements, in terms of precise information required, word length, presentation format, requirement for images, etc. Simply put, full compliance means all material conditions of a tender must be complied with and the price submitted should be based on the client’s tender specification documents.
If a tender is not compliant it may be rejected.
The precise content of a tender will vary considerably, depending on the procurement route, however it might include:
- A tender return slip, with details of the contract, including information such as return address and tender checklist;
- A completed tender pricing document (or contract sum analysis on design and build projects);
- Schedules of rates;
- An initial construction phase plan;
- Any design proposals or method statements that have been requested;
- Programme;
- Procedures to be adopted, such as procurement procedures and cost management procedures;
- Demonstration of capability, for example design capability, systems used etc;
- A BIM execution plan - if building information modelling is being used;
- Key project personnel, which may require submission of CVs;
- Management organisation;
- Plant and labour resources and availability;
- Prior experience, and
- References
However, some circumstances may allow a tender to be accepted even if it does not comply. A non-compliant proposal, sometimes referred to as a variant bid, may be submitted if the tenderer believes that an alternative could offer better value for money. However, non-compliant proposals should only be submitted if they have been requested or are explicitly permitted by the client, and they may need to be accompanied by a compliant bid.
[edit] Ways to create a compliant tender:
- Answer the question i.e. state what is required under each question;
- Answer all the question(s);
- Do not exceed the required word length;
- Do not supply information that is not required, e.g if a tender requires brief personal profiles, do not submit full CVs unless these are explicitly asked for;
- Do not leave sections blank;
- Submit in the correct format, e.g PDF, Excel, Word etc where required;
- Submit on time, and to the correct person;
- Ensure that proposals satisfy the client's requirements.
- Ensure works are packaged in the way the client requires.
- Visit the site, and if permitted, ask questions to avoid misunderstandings.
- Provide pricing information in the format and breakdown requested.
See also: Common mistakes in construction tenders.
[edit] Related articles on Designing Buildings Wiki
- Best value.
- Bidder.
- Bid writer.
- Competitive tender.
- Contract award.
- Contract conditions.
- Contract documents.
- Due diligence when selecting contractors or subcontractors.
- Invitation to tender.
- Letter of award.
- Mid-tender interview.
- Most Economically Advantageous Tender (MEAT).
- Pre-tender interview.
- Procurement route.
- Selection criteria.
- Tender documentation.
- Tender evaluation.
- Tender processes.
Featured articles and news
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.